Wasatch Boulder WallsCost Calculator

Davis County · 84014

Engineered Boulder Retaining Walls in Centerville, Utah

Keyed-in, battered, fully drained boulder walls built for Centerville's hillsides — from Centerville East Bench, Deuel Creek, Parrish Canyon Fan to Hills at Pages Lane. Stamped PE engineering and permits handled for every wall over 4 feet.

Typical Centerville project
$10,500 - $46,000+
Primary stone
Farmington Canyon Gneiss

Boulder Wall Cost Estimator — Centerville

60 ft
10 ft200 ft
Exposed wall height
Site condition
Equipment access width

Utah permit & PE stamp required. Measured from the bottom of the footing, this wall exceeds 4 feet under Centerville's building rules, so stamped engineering, geogrid design, and a permit are required. We coordinate all three.

Ballpark installed range

$13,100 – $22,600

Adjusted for Centerville material, access & labor costs.

Includes keyed-in base, filter fabric, drain-rock chimney & SDR-35 toe drain. Final price set after a site visit.


Get a firm quote for this wall

Centerville Soil & Drainage Conditions

Every retaining wall is only as good as the ground it's built in. Across Centerville, our site assessments typically find coarse canyon debris-flow cobbles, micaceous schist/gneiss boulders, and fast-draining Bonneville shoreline sands. Those conditions dictate how deep we key the base, how much drain rock goes behind the boulders, and whether geogrid reinforcement is needed — long before the first stone is set.

We work throughout Centerville's ZIP code (84014), including Centerville East Bench, Deuel Creek, Parrish Canyon Fan, Barnard Creek, Hills at Pages Lane. Each neighborhood has its own mix of slope, access, and soil, so every estimate starts with a site visit rather than a price-per-foot guess.

Why Retaining Walls Fail in Centerville

The most common failure we're called out to in Centerville: un-keyed hillside boulder stacks shifting during heavy spring runoff and rotting multi-tier timber walls on steep east-bench lots.

Almost every one traces back to the same root causes — no keyed-in base, no batter, native soil backfilled straight against the wall, and no path for water to escape. When we replace a failing wall, we remove it completely and rebuild to the 5-point standard below.

Failing wall repair & replacement

Our 5-Point Engineering Standard for Centerville Boulder Walls

These five details are included on every wall we build in Centerville — not upsells. They're the difference between a wall that lasts decades and one that leans after its first wet spring.

  1. 1. Keyed-In Base Trench

    6"–12" toe key-in below grade on compacted 3/4" road base

    Every Centerville wall starts below grade. We excavate a 6- to 12-inch key-in trench, then place and compact 3/4" road base in lifts to create a level, unyielding bearing pad for the base course. The largest boulders go here, set into the trench so the toe of the wall cannot kick out under load.

  2. 2. 8-to-12 Degree Batter

    Each lift steps back into the hillside

    A boulder wall is a gravity structure: its own weight resists the soil behind it. We set each course back 8 to 12 degrees from vertical so the wall leans into the slope, shifting its center of gravity toward the hill and locking every boulder against the stones below. Vertical "stacked" rockeries — common in builder-grade installs across the Wasatch Front — skip this step and are the first to rotate forward.

  3. 3. Non-Woven Geotextile Separation

    8oz filter fabric between native soil and drain rock

    Centerville's silts and sands will migrate into open drain rock and clog it within a few seasons. An 8oz non-woven geotextile lines the excavation between the native ground and the drainage zone, letting water through while holding soil particles in place so the drainage system keeps working for decades.

  4. 4. Hydrostatic Drainage Chimney

    12"–18" washed 3/4" crushed angular rock + 4" perforated SDR-35 toe drain

    Behind every boulder we place a 12- to 18-inch chimney of washed 3/4" crushed angular drain rock, with a 4-inch perforated SDR-35 pipe at the toe sloped to daylight or a suitable outlet. Water that reaches the wall drops straight down and out instead of building hydrostatic pressure — the single most common cause of the un-keyed hillside boulder stacks shifting during heavy spring runoff and rotting multi-tier timber walls on steep east-bench lots we see in Centerville.

  5. 5. Geogrid Soil Reinforcement

    Uniaxial geogrid tie-backs on walls over 4 ft or tiered slopes

    On walls over 4 feet and on tiered slopes, uniaxial geogrid layers are rolled out between compacted backfill lifts and tied back into the hillside per the engineer's design. The grid turns the soil behind the wall into a reinforced mass that works with the boulders rather than pushing against them — and it's what Davis County engineers expect to see on stamped plans.

Centerville Retaining Wall Permits & the 4-Foot Rule

Utah jurisdictions follow the International Building Code, which requires a permit and engineered design for retaining walls over 4 feet — measured from the bottom of the footing to the top of the wall, not just the visible face. Walls supporting a driveway, structure, or sloped backfill can trigger engineering at lower heights.

How we engineer walls over 4 feet

Local requirement

Centerville City Foothills Overlay and Geologic Hazard ordinances require geotechnical and structural sign-off on hillside walls over 4 feet

For every Centerville wall that crosses the threshold, we coordinate the Utah-licensed PE stamp, geogrid layout, and permit submittal, and build to the approved plans so inspection is straightforward.

Boulders We Use in Centerville

We source stone that suits both Centerville's soil and its look. Base courses always get the largest, densest boulders; upper courses are chosen for fit and face.

  • Farmington Canyon Gneiss
  • Davis Granite
  • Tan Quartzite
Compare quartzite, granite & limestone boulders

What a Boulder Retaining Wall Costs in Centerville

Most Centerville projects land between $10,500 - $46,000+. Use the estimator above for a ballpark on your wall, or see how each factor moves the price:

FactorHow it affects your Centerville price
HeightWalls over 4 ft add PE engineering, geogrid, permits, and much larger base boulders.
Tear-out vs. raw slopeRemoving and hauling off an existing failed wall adds demolition and disposal.
Access widthUnder 5 ft of side access means compact equipment and more hand placement than an 8 ft+ opening.
Stone selectionFarmington Canyon Gneiss, Davis Granite, Tan Quartzite differ in delivered cost and tons per foot of wall.

Centerville Retaining Wall FAQs

How much does a boulder retaining wall cost in Centerville, Utah?

Most engineered boulder retaining wall projects in Centerville fall between $10,500 and $46,000, with large or multi-tier estate projects running higher. Where a project lands in that range depends on four things: wall length, exposed height (walls over 4 feet add stamped PE engineering, geogrid reinforcement, and permit fees), whether we are building on a raw slope or tearing out and hauling off an existing failed wall, and site access — yards with less than 5 feet of side access require compact equipment and smaller lifts, which adds labor time compared with lots that have 8 feet or more. Stone selection matters too: Farmington Canyon Gneiss, Davis Granite, and Tan Quartzite vary in delivered cost and in how many tons it takes to build each foot of wall. Every quote includes the full 5-point drainage and base standard, so the number you see is for a wall built to last, not a stacked rockery.

Do I need a permit or a stamped engineering plan for a retaining wall in Centerville?

Centerville City Foothills Overlay and Geologic Hazard ordinances require geotechnical and structural sign-off on hillside walls over 4 feet. Under the International Building Code used across Utah, the 4-foot threshold is measured from the bottom of the footing to the top of the wall — not just the exposed face — so a wall that looks 3½ feet tall can still require a permit once the buried key-in course is counted. Walls that support a surcharge, such as a driveway, parking area, structure, or sloped backfill, typically require engineering regardless of height, and stacked tiers that are closer together than about twice the height of the lower wall are usually reviewed as a single taller wall. For any Centerville wall over 4 feet, we coordinate the Utah-licensed PE stamp, the geogrid design, and the permit submittal so the project is inspected and documented correctly.

How does Centerville's soil and drainage affect how a retaining wall is built?

In Centerville, we typically encounter coarse canyon debris-flow cobbles, micaceous schist/gneiss boulders, and fast-draining Bonneville shoreline sands. Fine silts and sands migrate into open drain rock and wash out from behind the wall (piping), which clogs the drainage and undermines the boulders. The 8oz non-woven filter fabric is what keeps those fines in place while still letting water through. Coarse cobble and gravel deposits drain well but are often loose or unevenly graded, so we excavate a 6"–12" key-in trench below grade and compact 3/4" road base in lifts to create a uniform, stable bearing surface for the base course. Where we hit fractured bedrock or rock shelves, we key the base course into the cut and step each lift back at an 8–12 degree batter so the wall leans into the hillside and locks under its own weight. Most retaining walls do not fail because the rocks are too small — they fail because water and fine soil were never managed behind them. That is why our drainage chimney, filter fabric, and toe drain are standard on every Centerville project, not upgrades.

What type of boulders do you use for retaining walls in Centerville?

For Centerville projects we primarily use Farmington Canyon Gneiss, Davis Granite, and Tan Quartzite. Farmington Canyon Gneiss is native to the Davis County canyons and blends with the surrounding hillside; we use the blockier, less foliated pieces in the structural courses. Davis Granite is a very dense, low-absorption stone that holds up to Utah winters and gives each boulder high mass per course. Tan Quartzite is extremely hard and dense, resists freeze-thaw weathering, and breaks into angular faces that interlock tightly from lift to lift. Regardless of stone type, the largest, heaviest boulders go in the keyed-in base course, each lift is set back at an 8–12 degree batter so the wall leans into the slope, and boulders are placed so they bear on at least two stones below rather than balancing on points. We can match stone to existing landscaping or HOA requirements in Davis County when a specific color or texture is required.

Do you build and replace retaining walls in Centerville East Bench, Deuel Creek, Parrish Canyon Fan, and other Centerville neighborhoods?

Yes. We build, repair, and replace retaining walls throughout Centerville, including Centerville East Bench, Deuel Creek, Parrish Canyon Fan, Barnard Creek, and Hills at Pages Lane. The most common problem we see in these neighborhoods is un-keyed hillside boulder stacks shifting during heavy spring runoff and rotting multi-tier timber walls on steep east-bench lots. When an existing wall is failing, we remove it completely — including rotted timber, broken block, and contaminated backfill — then rebuild with a keyed-in road-base trench, a battered boulder face, non-woven geotextile separation, a washed crushed-rock drainage chimney with a perforated SDR-35 toe drain, and geogrid tie-backs on any wall over 4 feet or any tiered slope.

Retaining Wall Services in Centerville

Boulder Retaining Walls Near Centerville

Open the full cost calculator